CPWD Works (48pp)48-Page CPWD Highway Feeder Road NIT — Turnover, Similar Works & Plant Machinery verified. Sign up free to run your own.

Start free

DEMO TENDER · 48 PAGESPUBLIC DEMO

CPWD-Feeder-Road-Upgradation-NIT-48pp.pdf

Ready — verified matrix

REQUIREMENTS

32

VERIFIED QUOTES

32 / 32

PAGES

48

NOT YET ASSESSED

—

CRITICAL DEADLINE TRAP: Physical Delivery RequiredClause CPWD-004 · Page 5
Online Upload Alone Will Be Disqualified

Tender mandates physical delivery of original Bank Guarantee / Demand Draft to the authority office before bid closing. Online PDF upload is insufficient. Ensure physical transit via Speed Post/courier is booked with ample buffer.

Verbatim Clause: “The physical submission of emd in original form before bid closing time is mandatory. The original demand draft must be submitted in the office of Executive Engineer.”
Check if your firm qualifies on Turnover & Work Experience (Go/No-Go Decision):

Pre-Qualification & Decision Hub5 criteria detected

Clearance:0/100
EMD / SecurityPage 4

Earnest Money Deposit (EMD): ₹6,40,000/- via Demand Draft or Banker’s Cheque of a Scheduled Bank.

PBG / DepositPage 26

Performance Guarantee (PG): 5% of tendered contract amount within 15 days of issue of LOA.

Min. TurnoverPage 8

Average Annual Financial Turnover of at least ₹2.40 Crores during the last 3 financial years with m…

Past ExperiencePage 14

Similar Work Experience: Three similar works of ₹1.28 Cr (40%), OR Two of ₹1.92 Cr (60%), OR One of…

20 / 32 rows
ID
RequirementPageSectionCategoryRequired actionVerified?
CPWD-001

Scope: Widening, strengthening, and resurfacing of 12.8 km highway feeder road with Dense Bituminous Macadam (DBM) and Bituminous Concrete (BC).

source quote
The work comprises widening of carriageway to 7.0m including GSB, WMM, 50mm DBM, and 40mm BC wearing coat over a stretch of 12.80 km.
p.2Section 1 — Notice Inviting Tender (NIT)technical_specsExecute sub-base (GSB 150mm), WMM 150mm, DBM 50mm, and BC 40mm wearing coat as per MoRTH specifications.Verified
CPWD-002

Valid CPWD enlistment in Class-I (Civil) category or composite road infrastructure enlistment.

source quote
Contractors must be enlisted in Class I (Civil) category of CPWD. Non-CPWD road contractors must meet stringent PQ criteria.
p.3NIT Clause 2.1 — Enlistment RuleEligibilityUpload certified copy of valid CPWD Class-I Enlistment Order with revalidation validity extending past bid date.Verified
CPWD-003

Earnest Money Deposit (EMD): ₹6,40,000/- via Demand Draft or Banker’s Cheque of a Scheduled Bank.

source quote
Earnest Money of ₹6,40,000 shall be deposited in the form of Deposit at Call receipt or DD/FDR of any Scheduled Commercial Bank.
p.4NIT Clause 3.1 — Earnest Moneyfinancial_termsObtain physical Demand Draft of ₹6,40,000 in favour of Executive Engineer, CPWD Division.Verified
CPWD-004

FATAL TRAP: Mandatory physical submission of original EMD hardcopy to Executive Engineer prior to bid closing.

source quote
The physical submission of emd in original form before bid closing time is mandatory. The original demand draft must be submitted in the office of Executive Engineer.
p.5NIT Clause 3.3 — Submission ConditionsSubmissionDeliver original physical DD and notarized affidavits to the EE office before 15:00 hrs on the bid closing day.Verified
CPWD-005

Average Annual Financial Turnover of at least ₹2.40 Crores during the last 3 financial years with mandatory CA UDIN.

source quote
Average annual financial turnover on construction work should be at least ₹2.40 Crores during the immediate last three consecutive financial years ending 31st March, certified by CA with UDIN.
p.8CPWD-6 Clause 1.2 — Financial Turnoverfinancial_termsFurnish CA audited balance sheets and UDIN-stamped turnover certificate proving >= ₹2.40 Cr average.Verified
CPWD-006

Bank Solvency Certificate from a Scheduled Commercial Bank for a minimum amount of ₹1.28 Crores.

source quote
The contractor should submit a Banker’s Solvency Certificate from a Scheduled Bank for a minimum value of ₹1.28 Crores (40% of estimated cost) issued within 6 months.
p.10CPWD-6 Clause 1.3 — Bank Solvencyfinancial_termsObtain banker solvency certificate on bank stationery not older than 6 months from date of NIT.Verified
CPWD-007

Similar Work Experience: Three similar works of ₹1.28 Cr (40%), OR Two of ₹1.92 Cr (60%), OR One of ₹2.56 Cr (80%) in last 7 years.

source quote
Must have successfully completed three similar works each costing not less than ₹1.28 Cr or two similar works each costing ₹1.92 Cr or one similar work of ₹2.56 Cr during the last seven years.
p.14CPWD-6 Clause 1.4 — Work CredentialsEligibilityProvide client completion certificates signed by officer not below Executive Engineer rank showing value and completion date.Verified
CPWD-008

Strict definition of Similar Work: Bituminous flexible road construction (DBM/BC) or rigid concrete pavement.

source quote
Similar work shall mean: Construction, widening, strengthening, or resurfacing of flexible bituminous pavements (DBM/BC) on Highways, Expressways, or PWD District Roads.
p.15CPWD-6 Clause 1.4.1 — Similar Work DefinitionEligibilityVerify that submitted certificates explicitly mention DBM or Bituminous Concrete laying on Highways or Major District Roads.Verified
CPWD-009

Mandatory deployment of Hot Mix Plant (Batch type min 100-120 TPH) within 35 km radius of worksite.

source quote
The bidder must own or possess a legally valid lease for an automated Batch Type Hot Mix Plant of minimum 100-120 TPH capacity located within 35 km of the site.
p.19Section 4 — Plant & Machinerytechnical_specsFurnish ownership proof or registered long-term lease agreement for 100-120 TPH batch hot mix plant.Verified
CPWD-010

Electronic Sensor Paver Finisher (screed width 7.0m) and Tandem Rollers (8-10 tonne) - minimum 2 Nos.

source quote
Bituminous concrete must be laid using an Electronic Sensor Paver with automatic level control and compacted by two 8-10 tonne tandem vibratory rollers and one pneumatic tyre roller.
p.20Section 4 — Compaction Equipmenttechnical_specsDeploy electronic hydrostatic sensor paver with automatic level sensing and vibratory tandem rollers.Verified
CPWD-011

Establishment of fully equipped field laboratory at site within 15 days of Letter of Acceptance (LOA).

source quote
Contractor shall establish a site laboratory equipped with bitumen extraction apparatus, Marshall stability test apparatus, compression testing machine, and core cutter at their own cost.
p.22Section 5 — Quality Control & Testingtechnical_specsSet up lab with centrifuge bitumen extractor, Marshall test apparatus, motorized sieve shaker, and compression machine.Verified
CPWD-012

Performance Guarantee (PG): 5% of tendered contract amount within 15 days of issue of LOA.

source quote
The contractor shall submit an irrevocable Performance Guarantee of 5% of the tendered amount within 15 days of issue of letter of acceptance.
p.26CPWD GCC Clause 1 — Performance Guaranteefinancial_termsSubmit unconditional Bank Guarantee of 5% value valid up to Defect Liability Period + 60 days.Verified
CPWD-013

Security Deposit (SD): 2.5% deducted from each running account (RA) bill until full recovery.

source quote
A sum @ 2.5% of the gross amount of each running bill shall be deducted as Security Deposit until the total reaches 2.5% of the tendered value.
p.27CPWD GCC Clause 1A — Security Depositfinancial_termsBudget for 2.5% cash retention on every intermediate payment bill.Verified
CPWD-014

Defect Liability Period (DLP): 36 months (3 years) from completion certificate for bituminous resurfacing.

source quote
The defect liability period for bituminous concrete surfacing work shall be 36 months. Any rutting, raveling, or potholes must be repaired by contractor within 48 hours of notice.
p.31CPWD Special Conditions Clause 17 — DLPlegal_statutoryGuarantee road surface free of potholes, rutting, or bleeding for 36 months post completion.Verified
CPWD-015

Joint Venture (JV) & Consortium Prohibition: Strictly solo bidder execution only.

source quote
Joint venture not allowed. Joint venture prohibited and consortium not allowed for this tender. Bids submitted by JV shall be summarily rejected.
p.34NIT Clause 6 — Sole Bidder ConditionEligibilityBid directly as single entity; joint ventures will be rejected at technical evaluation stage.Verified
CPWD-016

Notarized Affidavit on ₹100/- non-judicial stamp paper confirming non-blacklisting and non-debarment (Format 1).

source quote
Bidder must submit a notarized affidavit on ₹100 stamp paper stating they have never been blacklisted or debarred by CPWD, MoRTH, or State PWD.
p.36Annexure B — Format 1 Notarized Affidavitlegal_statutorySubmit sworn affidavit before public notary verifying zero pending debarment orders.Verified
CPWD-017

Bitumen Procurement: Strict mandate to procure VG-30 / VG-40 bitumen directly from PSU refineries (IOCL/BPCL/HPCL).

source quote
Bitumen VG-30 / VG-40 shall be procured directly by the contractor from PSU oil refineries (IOCL, BPCL, HPCL) with manufacturer test certificates. Third-party traders not allowed.
p.40Section 6 — Material Specificationstechnical_specsMaintain refinery invoices and batch test certificates for every consignment of bitumen.Verified
CPWD-018

Compensation for Delay: 1.0% per month computed on per-day basis, capped at 10% of tendered amount.

source quote
If contractor fails to maintain progress, compensation for delay shall be levied @ 1.0% per month of delay on per day basis, subject to a maximum of 10% of tendered value.
p.43CPWD GCC Clause 2 — Delay Liquidated Damagespenalties_slaAdhere to milestone schedule: Milestone 1 (25% at 2 months), Milestone 2 (50% at 5 months), Completion (9 months).Verified
CPWD-019

1% Building and Other Construction Workers (BOCW) Welfare Cess deduction from gross running account bills.

source quote
1% labour welfare cess shall be deducted from each gross running bill and credited to State BOCW Welfare Board.
p.45CPWD GCC Clause 7B — Labour Cessfinancial_termsAccount for 1% BOCW cess deduction under Building and Other Construction Workers Welfare Cess Act, 1996.Verified
CPWD-020

Corrigendum 1: Extension of contract completion period from 6 months to 9 months including monsoon.

source quote
Corrigendum 1: The time allowed for completion of work is revised from 6 months to 9 months (including monsoon period).
p.48Corrigendum 1 — Revised Completion PeriodSubmissionSubmit revised bar chart schedule based on 9 months execution timeframe.Verified

Read-only public demo — every row above was extracted from the real tender PDF, and each verified quote was confirmed against the cited page.