Live demoA real 343-page government tender, parsed and verified. Sign up free to run your own.

Start free

Tender #8 · 343 pages · public demo

RFPtenderdocument.pdf

Ready

Export to Excel

991

Requirements found so far

982 / 991

Verified quotes

343

Pages

Not yet assessed

120 / 991 rows · showing 30
IDRequirementPageSectionCategoryRequired actionVerified?
R-011

The regulatory framework for the BSL-3 lab must comply with DBT-ICMR National Guidelines for BSL-3 Laboratory, 2024 (as updated from time to time).

source quote
Regulatory framework (Mandatory) DBT-ICMR National Guidelines for BSL-3 Laboratory, 2024 (as updated from time to time)
p.2MandatoryComply with DBT-ICMR National Guidelines for BSL-3 Laboratory, 2024 (as updated from time to time).Verified
R-041

The consultant/selected bidder shall remain fully and exclusively responsible and accountable for the accuracy, completeness, technical soundness, regulatory compliance (including but not limited to DBT-ICMR National Guidelines, 2024 and any amendment thereon), biosafety/biosecurity integrity, and overall fitness-for-purpose of all services and deliverables provided under this engagement.

source quote
Notwithstanding any review, approval, consent, or acceptance provided by AIIMS Patna or its authorized representatives at any stage of the project—whether in respect of designs, drawings, technical specifications, reports, equipment selection, validation protocols, construction-stage technical support and design-intent compliance review, or any other deliverable or process—the consultant/selected bidder shall remain fully and exclusively responsible and accountable for the accuracy, completeness, technical soundness, regulatory compliance (including but not limited to DBT-ICMR National Guidelines, 2024 and any amendment thereon), biosafety/biosecurity integrity, and overall fitness-for-purpose of all services and deliverables provided under this engagement.
p.5MandatoryEnsure full and exclusive responsibility and accountability for accuracy, completeness, technical soundness, regulatory compliance (including DBT-ICMR National Guidelines, 2024), biosafety/biosecurity integrity, and overall fitness-for-purpose of all services and deliverables.Verified
R-042

The consultant/selected bidder must carry out all necessary corrections, revisions, revalidation, or remedial measures at their own cost, without any additional financial liability to AIIMS Patna, if any deliverable is found to be non-compliant or deficient prior to (during) final operational handover/certification process, even if previously approved.

source quote
The consultant/selected bidder further undertakes to carry out all necessary corrections, revisions, revalidation, or remedial measures at their own cost, without any additional financial liability to AIIMS Patna, in the event that any deliverable, even if previously approved, is found to be non-compliant or deficient at any point prior to (during) final operational handover/certification process.
p.5MandatoryPerform all necessary corrections, revisions, revalidation, or remedial measures at own cost for non-compliant or deficient deliverables prior to final operational handover/certification.Verified
R-054

The establishment, design, construction, commissioning, validation, certification support, and operational-readiness planning of the proposed facility shall be governed primarily by the DBT-ICMR National Guidelines for Biosafety Level-3 Laboratory, 2024, as amended or updated from time to time.

source quote
The establishment, design, construction, commissioning, validation, certification support, and operational-readiness planning of the proposed facility shall be governed primarily by the DBT-ICMR National Guidelines for Biosafety Level-3 Laboratory, 2024, as amended or updated from time to time.
p.161.1 (iv)MandatoryThe selected A&E Consultant must ensure that the project adheres to the DBT-ICMR National Guidelines for Biosafety Level-3 Laboratory, 2024, and any subsequent amendments or updates.Verified
R-055

The facility shall also be planned in alignment with applicable statutory, regulatory, biosafety, biosecurity, environmental, biomedical waste, building, fire safety, engineering, and institutional requirements, including the Environment (Protection) Act, 1986, Rules relating to hazardous microorganisms/genetically engineered organisms or cells, applicable IBSC/RCGM requirements, National Building Code, relevant BIS/IS codes, CPCB/BPCB requirements, CPWD guidelines and other applicable national and international best practices/guidelines (latest), wherever relevant.

source quote
The facility shall also be planned in alignment with applicable statutory, regulatory, biosafety, biosecurity, environmental, biomedical waste, building, fire safety, engineering, and institutional requirements, including the Environment (Protection) Act, 1986, Rules relating to hazardous microorganisms/genetically engineered organisms or cells, applicable IBSC/RCGM requirements, National Building Code, relevant BIS/IS codes, CPCB/BPCB requirements, CPWD guidelines and other applicable national and international best practices/guidelines (latest), wherever relevant.
p.161.1 (iv)MandatoryThe selected A&E Consultant must plan the facility in alignment with all specified statutory, regulatory, and institutional requirements, including but not limited to the Environment (Protection) Act, 1986, IBSC/RCGM requirements, National Building Code, BIS/IS codes, CPCB/BPCB requirements, and CPWD guidelines.Verified
R-056

The selected A&E Consultant shall be responsible for providing integrated professional services covering site verification, existing facility assessment, retrofitting assessment, biosafety risk assessment, laboratory workflow planning, containment zoning, architectural planning, engineering design, HVAC and containment engineering, MEP and utility design, building automation and monitoring systems, BIM, CFD analysis, equipment planning, technical specifications, DPR, cost estimates, BOQ, subsequent tender document, pre-bid &

source quote
The selected A&E Consultant shall be responsible for providing integrated professional services covering site verification, existing facility assessment, retrofitting assessment, biosafety risk assessment, laboratory workflow planning, containment zoning, architectural planning, engineering design, HVAC and containment engineering, MEP and utility design, building automation and monitoring systems, BIM, CFD analysis, equipment planning, technical specifications, DPR, cost estimates, BOQ, subsequent tender document, pre-bid &
p.161.1 (v)MandatoryThe selected A&E Consultant must provide integrated professional services including site verification, facility assessment, retrofitting assessment, biosafety risk assessment, laboratory workflow planning, containment zoning, architectural planning, engineering design, HVAC and containment engineering, MEP and utility design, building automation and monitoring systems, BIM, CFD analysis, equipment planning, technical specifications, DPR, cost estimates, BOQ, and subsequent tender documents.Verified
R-057

The proposed facility is required to function as a safe, compliant, maintainable, certifiable, and operationally efficient BSL-3 laboratory with associated BSL-2/support areas, proper personnel/material/sample/waste flow, controlled access, negative pressure containment, HEPA filtration, decontamination systems, emergency provisions, monitoring and alarm systems, and appropriate redundancy for critical systems.

source quote
(vi) The proposed facility is required to function as a safe, compliant, maintainable, certifiable, and operationally efficient BSL-3 laboratory with associated BSL-2/support areas, proper personnel/material/sample/waste flow, controlled access, negative pressure containment, HEPA filtration, decontamination systems, emergency provisions, monitoring and alarm systems, and appropriate redundancy for critical systems.
p.17MandatoryDesign the facility to function as specified.Verified
R-058

The design shall not be limited to indicative inputs provided by AIIMS Patna; rather, the A&E Consultant shall apply its professional expertise, independent assessment, domain knowledge, biosafety expertise & understanding, compliance, engineering competence, and regulatory experience to develop a complete, coordinated, fit-for-purpose, and certification-ready design solution duly executable at construction and certification level.

source quote
The design shall not be limited to indicative inputs provided by AIIMS Patna; rather, the A&E Consultant shall apply its professional expertise, independent assessment, domain knowledge, biosafety expertise & understanding, compliance, engineering competence, and regulatory experience to develop a complete, coordinated, fit-for-purpose, and certification-ready design solution duly executable at construction and certification level.
p.17MandatoryApply professional expertise and experience to develop a complete, coordinated, fit-for-purpose, and certification-ready design solution.Verified
R-059

This RFP is therefore issued for selection of a competent A&E Consultant capable of delivering the technical foundation for subsequent execution, commissioning, validation, certification, and operational readiness of the proposed BSL-3 laboratory at AIIMS Patna.

source quote
(vii) This RFP is therefore issued for selection of a competent A&E Consultant capable of delivering the technical foundation for subsequent execution, commissioning, validation, certification, and operational readiness of the proposed BSL-3 laboratory at AIIMS Patna.
p.17EligibilityBe a competent A&E Consultant capable of delivering the technical foundation for subsequent execution, commissioning, validation, certification, and operational readiness.Verified
R-060

The A&E Consultant shall be responsible for assessing the existing facility/infrastructure, identifying required retrofitting and engineering interventions, developing the master plan, preparing biosafety risk assessment and workflow planning, designing containment and engineering systems, integrating architectural, MEP, HVAC, utility, automation, monitoring, laboratory equipment, BIM and CFD requirements, and preparing all technical documentation required for mandatory clearances (such as fire safety/environmental clearance etc.), procurement, construction, commissioning, validation and certification.

source quote
The A&E Consultant shall be responsible for assessing the existing facility/infrastructure, identifying required retrofitting and engineering interventions, developing the master plan, preparing biosafety risk assessment and workflow planning, designing containment and engineering systems, integrating architectural, MEP, HVAC, utility, automation, monitoring, laboratory equipment, BIM and CFD requirements, and preparing all technical documentation required for mandatory clearances (such as fire safety/environmental clearance etc.), procurement, construction, commissioning, validation and certification.
p.182.1 (ii)MandatoryPerform the specified tasks including assessment, planning, design, integration, and documentation.Verified
R-061

The A&E Consultant shall ensure that the proposed solution is practical for execution, suitable for tendering, verifiable during construction, and capable of supporting successful commissioning, validation, biosafety validation and certification processes.

source quote
The A&E Consultant shall ensure that the proposed solution is practical for execution, suitable for tendering, verifiable during construction, and capable of supporting successful commissioning, validation, biosafety validation and certification processes.
p.182.1 (iii)MandatoryEnsure the proposed solution meets the specified criteria for execution, tendering, verification, and support for commissioning, validation, and certification.Verified
R-062

The consultancy services shall result in a complete package of deliverables, including site assessment, design basis documents, master plan, containment zoning strategy, workflow plans, coordinated drawings, engineering calculations, BIM outputs, CFD analysis, technical specifications, equipment utility requirements, cost estimates, DPR, BOQ, tender documents, construction-stage technical review inputs, commissioning and validation support documents, certification-support documentation, and as-built / handover records etc., as required under this RFP.

source quote
(iv) The consultancy services shall result in a complete package of deliverables, including site assessment, design basis documents, master plan, containment zoning strategy, workflow plans, coordinated drawings, engineering calculations, BIM outputs, CFD analysis, technical specifications, equipment utility requirements, cost estimates, DPR, BOQ, tender documents, construction-stage technical review inputs, commissioning and validation support documents, certification-support documentation, and as-built / handover records etc., as required under this RFP.
p.182.1 (iv)MandatoryProvide a complete package of deliverables as listed.Verified
R-063

The A&E Consultant shall not merely reproduce the indicative requirements provided by AIIMS Patna, but shall apply its professional expertise, independent assessment, biosafety knowledge, engineering judgment and regulatory understanding to develop a complete, coordinated and fit-for-purpose solution.

source quote
(v) The A&E Consultant shall not merely reproduce the indicative requirements provided by AIIMS Patna, but shall apply its professional expertise, independent assessment, biosafety knowledge, engineering judgment and regulatory understanding to develop a complete, coordinated and fit-for-purpose solution.
p.182.1 (v)MandatoryApply professional expertise, independent assessment, biosafety knowledge, engineering judgment and regulatory understanding to develop a complete, coordinated and fit-for-purpose solution.Verified
R-064

The Bidder shall submit, as part of its Technical Bid, a preliminary Need Assessment Note for the proposed BSL-3 Laboratory at AIIMS Patna, based on the information provided in this RFP, the existing building details, indicative laboratory activities, proposed equipment profile, applicable biosafety requirements, and the Bidder’s professional understanding of similar high-containment laboratory facilities.

source quote
(i) The Bidder shall submit, as part of its Technical Bid, a preliminary Need Assessment Note for the proposed BSL-3 Laboratory at AIIMS Patna, based on the information provided in this RFP, the existing building details, indicative laboratory activities, proposed equipment profile, applicable biosafety requirements, and the Bidder’s professional understanding of similar high-containment laboratory facilities.
p.192.2 (i)SubmissionSubmit a preliminary Need Assessment Note as part of the Technical Bid.Verified
R-065

The Need Assessment shall not be a mere reproduction of the RFP provisions. It shall reflect the Bidder’s independent professional assessment of what is required to convert the identified existing building space into a safe, compliant, functional, maintainable, and certification-oriented BSL-3 laboratory facility.

source quote
The Need Assessment shall not be a mere reproduction of the RFP provisions. It shall reflect the Bidder’s independent professional assessment of what is required to convert the identified existing building space into a safe, compliant, functional, maintainable, and certification-oriented BSL-3 laboratory facility.
p.192.2 (ii)MandatoryEnsure the Need Assessment reflects an independent professional assessment and is not a mere reproduction of RFP provisions.Verified
R-066

The Need Assessment Note shall, at minimum, cover the Bidder’s assessment of functional laboratory requirements, BSL-3 and associated BSL-2/support area requirements, personnel/material/sample/waste workflow, containment zoning, pressure cascade requirements, HVAC and HEPA filtration needs, utility and power redundancy requirements, decontamination and waste management needs, equipment integration requirements, access control and security needs, emergency and safety provisions, validation and certification requirements, and key risks requiring attention during design and execution.

source quote
(iii) The Need Assessment Note shall, at minimum, cover the Bidder’s assessment of functional laboratory requirements, BSL-3 and associated BSL-2/support area requirements, personnel/material/sample/waste workflow, containment zoning, pressure cascade requirements, HVAC and HEPA filtration needs, utility and power redundancy requirements, decontamination and waste management needs, equipment integration requirements, access control and security needs, emergency and safety provisions, validation and certification requirements, and key risks requiring attention during design and execution.
p.192.2 (iii)MandatoryInclude the specified minimum content in the Need Assessment Note.Verified
R-067

The Bidder shall also identify any additional requirement, gap, constraint, assumption, interface issue, or clarification which, in its professional opinion, may affect design development, tender preparation, construction execution, commissioning, validation, certification, operation, maintenance, or long-term compliance of the facility.

source quote
(iv) The Bidder shall also identify any additional requirement, gap, constraint, assumption, interface issue, or clarification which, in its professional opinion, may affect design development, tender preparation, construction execution, commissioning, validation, certification, operation, maintenance, or long-term compliance of the facility.
p.192.2 (iv)MandatoryIdentify and mention any additional requirements, gaps, constraints, assumptions, interface issues, or clarifications in the Need Assessment Note.Verified
R-068

Where any information provided by AIIMS Patna is considered indicative, insufficient, inconsistent, or requiring verification, the Bidder shall clearly mention the same in the Need Assessment Note.

source quote
Where any information provided by AIIMS Patna is considered indicative, insufficient, inconsistent, or requiring verification, the Bidder shall clearly mention the same in the Need Assessment Note.
p.192.2 (iv)MandatoryClearly mention in the Need Assessment Note any AIIMS Patna information considered indicative, insufficient, inconsistent, or requiring verification.Verified
R-069

The fundamental philosophy underlying the design of the BSL-3 Laboratory at AIIMS Patna shall be to create a safe, compliant, functional, maintainable, validation-supportive and certification-ready high-containment laboratory facility that provides comprehensive, multi-layered protection to laboratory personnel, support staff, the institution, the community and the environment from exposure to high risk biological agents handled within the facility.

source quote
(i) The fundamental philosophy underlying the design of the BSL-3 Laboratory at AIIMS Patna shall be to create a safe, compliant, functional, maintainable, validation-supportive and certification-ready high-containment laboratory facility that provides comprehensive, multi-layered protection to laboratory personnel, support staff, the institution, the community and the environment from exposure to high risk biological agents handled within the facility.
p.192.3 (i)MandatoryDesign the BSL-3 Laboratory based on the specified fundamental philosophy.Verified
R-070

The A&E Consultant shall therefore develop the design after proper assessment of the existing building, available space, structural and service constraints, utility interfaces, equipment movement requirements, access conditions, maintainability requirements and regulatory compliance obligations.

source quote
The A&E Consultant shall therefore develop the design after proper assessment of the existing building, available space, structural and service constraints, utility interfaces, equipment movement requirements, access conditions, maintainability requirements and regulatory compliance obligations.
p.202.3 (ii)MandatoryDevelop the design after proper assessment of the existing building and other specified factors.Verified
R-071

The design shall not be treated merely as an interior fit-out, but as an integrated high-containment laboratory system.

source quote
The design shall not be treated merely as an interior fit-out, but as an integrated high-containment laboratory system.
p.202.3 (ii)MandatoryTreat the design as an integrated high-containment laboratory system, not merely an interior fit-out.Verified
R-072

The design shall incorporate reliable, testable and maintainable containment measures proportionate to the nature and level of risk.

source quote
The design shall incorporate reliable, testable and maintainable containment measures proportionate to the nature and level of risk.
p.202.4MandatoryIncorporate reliable, testable, and maintainable containment measures proportionate to risk.Verified
R-073

The design shall ensure that: All work involving biological agents is carried out within appropriately selected, located, installed and certified biological safety cabinets or other containment equipment, as required by risk assessment and applicable guidelines.

source quote
(i) All work involving biological agents is carried out within appropriately selected, located, installed and certified biological safety cabinets or other containment equipment, as required by risk assessment and applicable guidelines;
p.202.4 (a) (i)MandatoryEnsure all work involving biological agents is carried out within appropriately selected, located, installed, and certified biological safety cabinets or other containment equipment.Verified
R-074

The design shall ensure that: The laboratory environment itself maintains appropriate negative pressure relationship with respect to adjacent non-containment areas, thereby creating inward airflow and preventing escape of potentially contaminated air.

source quote
(ii) The laboratory environment itself maintains appropriate negative pressure relationship with respect to adjacent non-containment areas, thereby creating inward airflow and preventing escape of potentially contaminated air;
p.202.4 (a) (ii)MandatoryEnsure the laboratory environment maintains appropriate negative pressure relative to adjacent non-containment areas.Verified
R-075

The design shall ensure that: Air movement, pressure cascade, door interlocks, airflow paths and room relationships are must be planned to support containment and minimize cross-contamination risk.

source quote
(iii) Air movement, pressure cascade, door interlocks, airflow paths and room relationships are must be planned to support containment and minimize cross-contamination risk;
p.202.4 (a) (iii)MandatoryPlan air movement, pressure cascade, door interlocks, airflow paths, and room relationships to support containment and minimize cross-contamination risk.Verified
R-076

The design shall ensure that: All exhaust air and other relevant air streams shall be treated through suitable HEPA filtration and containment-oriented engineering systems, as applicable.

source quote
(iv) All exhaust air and other relevant air streams shall be treated through suitable HEPA filtration and containment-oriented engineering systems, as applicable.
p.202.4 (a) (iv)MandatoryTreat all exhaust air and relevant air streams through suitable HEPA filtration and containment-oriented engineering systems.Verified
R-077

UVGI may also be considered as a supplementary disinfection provision in HVAC/exhaust/air-treatment systems, wherever justified by biosafety expert & biosafety risk assessment and approved design philosophy; however, UVGI shall not be treated as a substitute for HEPA filtration, validated decontamination, cleaning, disinfection, commissioning or certification requirements.

source quote
UVGI may also be considered as a supplementary disinfection provision in HVAC/exhaust/air-treatment systems, wherever justified by biosafety expert & biosafety risk assessment and approved design philosophy; however, UVGI shall not be treated as a substitute for HEPA filtration, validated decontamination, cleaning, disinfection, commissioning or certification requirements.
p.202.4 (a) (iv)DesirableConsider UVGI as a supplementary disinfection provision if justified by biosafety expert & risk assessment and approved design philosophy, but not as a substitute for other requirements.Verified
R-078

The design shall ensure that: The layout must support correct use of PPE, controlled entry and exit, donning and doffing, shower / change procedures, emergency response and decontamination processes.

source quote
(v) The layout must support correct use of PPE, controlled entry and exit, donning and doffing, shower / change procedures, emergency response and decontamination processes;
p.202.4 (a) (v)MandatoryDesign the layout to support correct use of PPE, controlled entry/exit, donning/doffing, shower/change procedures, emergency response, and decontamination processes.Verified
R-079

The design shall ensure that: Emergency systems, alarms, communication systems, eyewash / safety shower provisions, spill response provisions and escape routes are appropriately planned and accessible.

source quote
(vi) Emergency systems, alarms, communication systems, eyewash / safety shower provisions, spill response provisions and escape routes are appropriately planned and accessible; and
p.212.4 (a) (vi)MandatoryPlan and make accessible emergency systems, alarms, communication systems, eyewash/safety shower provisions, spill response provisions, and escape routes.Verified
R-080

The design shall ensure that: The design supports occupational health, incident response and laboratory-acquired infection prevention measures through appropriate infrastructure, documentation interfaces and operational planning inputs.

source quote
(vii) The design supports occupational health, incident response and laboratory-acquired infection prevention measures through appropriate infrastructure, documentation interfaces and operational planning inputs.
p.212.4 (a) (vii)MandatoryDesign to support occupational health, incident response, and laboratory-acquired infection prevention measures.Verified

Read-only public demo — every row above was extracted from the real tender PDF, and each verified quote was confirmed against the cited page.